Just a few quick photos for today. We worked long and hard on days two and three. We finished we what came to do and a bit more. The homeowner expressed thanks for all we did and showed real appreciation for us being here. We are all tired, but feel good that we made a difference for this one family here on Staten Island.
 |
| Mike cuts a piece of casing for one of the windows. |
 |
| Mike nails in some casing on the bedroom window. |
 |
| Jeff inspects the opening in the front bath room where the homeowner wants to install a casement window. |
 |
| Don shows off the opening we created for the bathroom casement window. |
 |
| Jeff checks out the garden window that was stored in the bedroom. |
 |
| The bedroom floor installed/ |
 |
| Bruce plans out the kitchen. |
 |
| The finished result of Bruce’s long three days of work (with help from the team) – new garden window, cabinets installed, counter tops, sink in and all trimmed out. |
 |
| Olivia marks a window in the bedroom in preparation for casing the window out. |
 |
| Olivia shows off our finished casing work on the bedroom window. |
 |
| Don and Olivia prepare the living room floor for flooring to be installed. |
 |
| The living room floor going in. |